The art of building mathematical models of multistage deterministic inventories in manufacturing
EL ARTE DE CONSTRUIR MODELOS MATEMÁTICOS DE INVENTARIOS DETERMINÍSTICOS MULTIETAPAS EN MANUFACTURA
Show authors biography
This article presents the elaboration procedure in the construction of two-stage mathematical models in manufacturing. The way to elaborate the graphs, their mathematical relationships and the mathematical development to determine the variables of the model are described.
Article visits 1082 | PDF visits 844
Downloads
[1] D. Zissis, G. Ioannou, and A. Burnetas, “Coordinating Lot Sizing Decisions Under Bilateral Information Asymmetry,†Prod. Oper. Manag., doi: 10.1111/poms.13106. 2020.
[2] L. Liu, X. Liu, and D. D. Yao, “Analysis and Optimization of a Multistage Inventory-Queue System,†Management Science. doi: 10.1287/mnsc.1030.0196. 2004.
[3] F. J. C. T. de Ruiter, A. Ben-Tal, R. C. M. Brekelmans, and D. den Hertog, “Robust optimization of uncertain multistage inventory systems with inexact data in decision rules,†Comput. Manag. Sci., doi: 10.1007/s10287-016-0253-6. 2017.
[4] D. Gang, C. Li, Y. Z. Li, J. Y. Song, and A. Tanweer, “Optimization on production-inventory problem with multistage and varying demand,†J. Appl. Math., doi: 10.1155/2012/648262. 2012.
[5] L. Xin and D. A. Goldberg, “Time (in)consistency of multistage distributionally robust inventory models with moment constraints,†Eur. J. Oper. Res., doi: 10.1016/j.ejor.2020.07.041. 2020.
[6] L. Appelgren, H. E. Scarf, D. M. Gilford, and M. W. Shelly, “Multistage Inventory Models and Techniques,†Ekon. Tidskr., doi: 10.2307/3438707. 1964.
[7] L. Xin, D. Goldberg, and A. Shapiro, “Distributionally robust multistage inventory models with moment constraints,†arXiv Prepr. arXiv1304.3074, 2013.
[8] P. Nagaraj and V. Selladurai, “Analysis of optimum batch size in multistage, multifacility and multiproduct manufacturing systems,†Int. J. Adv. Manuf. Technol., doi: 10.1007/s001700200004. 2002.
[9] A. S. Babu and S. G. Deshmukh, “Some studies on integrated multistage production-inventory systems,†Eng. Costs Prod. Econ., doi: 10.1016/0167-188X(89)90119-5. 1989.
[10] A. Gunasekaran, A. S. Babu, and N. Ramaswamy, “Lot-sizing in a class of multistage production inventory systems,†Int. J. Syst. Sci., doi: 10.1080/00207729008910549. 1990.
[11] K. Morikawa, K. Takahashi, and D. Hirotani, “Maketo-stock policies for a multistage serial system under a make-to-order production environment,†Int. J. Prod. Econ., doi: 10.1016/j.ijpe.2013.02.016. 2014.
[12] M. A. Hoque and S. K. Goyal, “On lot streaming in multistage production systems,†Int. J. Prod. Econ., doi: 10.1016/j.ijpe.2003.12.003. 2005.
[13] K. Breithaupt, A. A. Ariel, and D. R. Hare, “Assembling an Inventory of Multistage Adaptive Testing Systems,†in Elements of Adaptive Testing, 2009.
[14] D. Rahmani, R. Ramezanian, P. Fattahi, and M. Heydari, “A robust optimization model for multiproduct two-stage capacitated production planning under uncertainty,†Appl. Math. Model., doi: 10.1016/j.apm.2013.04.016. 2013.