MODELO MATEMÁTICO DE PROGRAMACIÓN ENTERA NO LINEAL EN UN AMBIENTE JOB-SHOP Y MAQUINAS EN SERIE Y PARALELO

MODELO MATEMÁTICO DE PROGRAMACIÓN ENTERA NO LINEAL EN UN AMBIENTE JOB-SHOP Y MAQUINAS EN SERIE Y PARALELO




Section
Artículos

How to Cite
[1]
C. A. PINEDA PEREZ, “MODELO MATEMÁTICO DE PROGRAMACIÓN ENTERA NO LINEAL EN UN AMBIENTE JOB-SHOP Y MAQUINAS EN SERIE Y PARALELO”, Rev. Ing. Mat. Cienc. Inf, vol. 5, no. 9, Jan. 2018, Accessed: Nov. 24, 2024. [Online]. Available: https://ojs.urepublicana.edu.co/index.php/ingenieria/article/view/438

doi
Dimensions
PlumX
license

 

Esta obra está bajo una licencia internacional

Atribución/Reconocimiento 4.0 Internacional
CESAR AUGUSTO PINEDA PEREZ

    CESAR AUGUSTO PINEDA PEREZ,

    Magister en Ingeniería Industrial, Especialista en Ingeniería de Producción e Ingeniero Industrial de la Universidad Distrital. Docente investigador del Grupo O.C.A de la Corporación Universitaria Republicana.

     

     


    Este artículo presenta un modelo de programación matemática no lineal entera mixta para resolver un problema de programación de máquinas en serie y en paralelo en un entorno Job-Shop. El modelo PNLEM determina el makespan, la secuencia y la ruta de ejecución de los trabajos en las diferentes máquinas.

     

    DOI:http://dx.doi.org/10.21017/rimci.2018.v5.n9.a41


    Article visits 1735 | PDF visits 1099


    Downloads

    Download data is not yet available.
    1. A. P. Gnetis, P. Detti, et al., «Scheduling nonpreemptive jobs on parallel machines subject to exponential unrecoverable interruptions», Computers & Operations Research 79: 109-118. 2017.
    2. A. C. Beezão, J. F. Cordeau, et al., «Scheduling identical parallel machines with tooling constraints», European Journal of Operational Research 257(3): 834-844. 2017.
    3. A. Cataldo, A. Perizzato, et al., «Production scheduling of parallel machines with model predictive control», Control Engineering Practice 42: 28-40. 2015.
    4. B. C. Choi, M. J. Park, «Two-agent parallel machine scheduling with a restricted number of overlapped reserved tasks», European Journal of Operational Research 260(2): 514-519. 2017.
    5. L. Epstein and E. Kleiman, «Scheduling selfish jobs on multidimensional parallel machines», Theoretical Computer Science 694: 42-59. 2017.
    6. L. Fanjul-Peyro, F. Perea, et al. «Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources», European Journal of Operational Research 260(2) 482-493. 2017.
    7. A. Gara-Ali, G. Finke, et al. «Parallel-machine scheduling with maintenance: Praising the assignment problem», European Journal of Operational Research 252(1): 90-97. 2016.
    8. P. Györgyi, «A PTAS for a resource scheduling problem with arbitrary number of parallel machines». Operations Research Letters 45(6): 604-609. 2017.
    9. P. Györgyi and T. Kis, «Approximation schemes for parallel machine scheduling with non-renewable resources», European Journal of Operational Research 258(1): 113-123. 2017.
    10. D. Jiang and J. Tan. «Scheduling with job rejection and nonsimultaneous machine available time on unrelated parallel machines.» Theoretical Computer Science 616: 94-99. 2016.
    11. Y. Jiang, T. Li, et al. «Kinematic error modeling and identification of the over-constrained parallel kinematic machine.» Robotics and Computer-Integrated Manufacturing 49: 105-119. 2018.
    Sistema OJS 3.4.0.5 - Metabiblioteca |